|
| |

Maximum
and minimum piezometric pressure head envelopes for a pumping main (main pumps
at Ch 4462m; booster pump at CH26503m) created during the transient flow
generated by the simultaneous trip of both pumps. Air Valve located at CH29000m.
Capabilities
The computer program (PTRAN) developed by Dr. Adrian Boldy,
Director of HydroSim Consultants Limited, is capable of simulating the transient
response of any conceivable pumping main equipped with any number of main and/or
booster pumping stations.
In addition to the pump(s)
any of the following boundary conditions may be incorporated into a given
simulation:
-
Pump flywheel
-
Pressure relief valve
-
Bypass valve
-
Pump discharge
check valve
-
Control valve
-
Variable area surge chamber
-
Variable area air vessel
-
Feed tank
-
Air inlet/outlet
pressure surge alleviation valve
-
Reservoir
-
Reference Projects
-
HydroSim Consultants Limited has undertaken a pressure
surge investigation for the
-
pumping mains listed
under the following clients:
-
-
Brown & Root
Limited
-
Dar Es Salam, Darwell, Stewardstone, Paphos, Great Man-Made River
-
Hyder Consulting Limited
-
Gorswen
-
The Bedford Pump Company Limited
-
Dover & Folkestone Pumping Stations PS2 and PS5
-
Balfour Beatty Projects
-
Titterworth Backwash System
-
GU Projects
-
Unified Pumping System
-
Earth Tech Engineering Limited
-
Greystone-Norwood, Chalgli, Reay-Armadale, Altbea-Mellon Charles, Altbea-
Laide
-
Pick Everard Consultants
-
Thetford, North Norfolk Waste Water Management
-
Charles Haswell Consultants
-
Church Wilne
-
Rofe, Kennard & Lapworth Consultants
-
Grimswith-Nidd, Gituamba, Mission Ridge II
-
Ove Arup Consultants
-
City Link Sewerage System
-
Kvaerner Construction Limited
-
Lostock Condensate System
-
Nippon Koei Limited
-
Great Man-Made River
-
L.G. Mouchel Consultants
-
Pottery Quay, Ocean Court, West Hoe, St. Lenards Road
|